Active sites

Every stage has an owner.

Projects under execution are tracked both operationally and financially, with the interfaces between disciplines settled early, not at the last minute.

Projects in progress
8 active sites
Typology
Residential · offices · nuclear research
Planning
At least 3 years of visibility
Under execution

Our projects under execution

The list is taken in full from the current site, with the technical data and the publicly declared clients.

01

One Verdi Park

Mechanical installation works — plumbing and HVAC — plus power and extra-low-voltage electrical installations for two buildings of 3 basements, ground floor and up to 20 upper floors, and a retail area. 164 Barbu Văcărescu Blvd., district 2, Bucharest.

PlumbingHVACPowerExtra-low voltage
Client
One United Properties
Height
3S+P+1E+2E–20E
02

One Modrogan

MEP installation works for apartment buildings with 2 basements, ground floor, 3 upper floors and a set-back floor. 1A Aleea Modrogan, district 1, Bucharest.

MEPResidential
Client
One United Properties
Height
2S+P+3E+4Er
03

ATHENA experimental facility

MEP installation works as part of the procurement of design services and construction works for buildings and the supply of the ATHENA experimental facility. Mioveni, Argeș county.

MEPNuclear research
Client
Romanian Authority for Nuclear Energy Technologies (RATEN)
04

Complexul Tineretului Park Residence

Mechanical, electrical and plumbing installations. 74 Dâmbului St., district 4, Bucharest.

MechanicalElectricalPlumbing
End client
Soldiers Field Estates SRL
Main contractor
SOMET SA
05

TRIAMA Residence — phase 2

MEP installation works for block B, with 2 basements, ground floor and 11 upper floors. 1 Baia de Aramă St., district 2, Bucharest.

MEPResidential
End client
Mills Invest SRL
Developer
Speedwell Romania
06

Vitan Residence 3

MEP installation works for the development at 17 Moților St., district 3, Bucharest.

MEPResidential
Developer
Indiana Expert SA
07

Unirii View — maintenance

Preventive and corrective maintenance for the electrical installations of an office building of 3 basements, ground floor, 17 upper floors and a technical floor. 6–8 Corneliu Coposu Blvd., district 3, Bucharest.

MaintenanceElectrical
Contracting party
Unirii View SRL
Height
3S+P+17E+Eth
08

Baba Novac Residence — warranty

Warranty contract for the mechanical installation works executed — plumbing, ventilation and heating — at the residential complex of 363 apartments across 6 buildings, each with a basement, ground floor and 8 upper floors. 61 Eufrosina Popescu St., district 3, Bucharest.

WarrantyPlumbingVentilationHeating
Client
Țesătoriile Reunite SA
Scale
363 apartments · 6 buildings
Gallery

The infrastructure we build

Filter by type of installation. Click an image to enlarge it — the arrows and the ← → keys move through the current selection.

4 photos
Industrial plant lit up at night
Industrial plantElectrical · Mechanical
Industrial installation with pipework and steel structures
Process installationsMechanical
Plant room with rows of equipment cabinets
Plant roomExtra-low voltage
Aerial view of a power generation facility
Power generationElectrical
Working standard

How we keep a site under control.

  1. 01

    Coordination

    Interfaces between disciplines are tracked from the start, not fixed at the last minute.

  2. 02

    Control

    Works are verified through tests and trials before commissioning.

  3. 03

    Monitoring

    Every project is tracked both operationally and financially.

  4. 04

    Continuity

    Documentation and communication remain part of the project after execution ends.

Full portfolio

See the completed works too.

15 reference projects, with clients and technical data.

Completed projects